Posted by stevemata on July 28, 2009
Identifying a situation appropriate growth rate is necessary to accurately project economic growth and military production capability.
The below chart shows the cost in time of generating the resources required for the construction of an additional T3 power at 100%, 50% and 25% growth priorities, assuming unlimited mass fabrication capacity and engineering capacity.

Posted in Uncategorized | Tagged: economic growth projection, military production capability, supcom, supreme commander | Leave a Comment »
Posted by stevemata on July 5, 2009
Price is calculated in accordance with psalm 14
Price = Mass + E/40


Posted in Uncategorized | Tagged: aircraft, supcom, supreme commander, unit charts | Leave a Comment »