Supcom Psalms

Supreme Commander is Life.

Archive for July, 2009

38. Economic Growth Projection

Posted by stevemata on July 28, 2009

Identifying a situation appropriate growth rate is necessary to accurately project economic growth and military production capability.

The below chart shows the cost in time of generating the resources required for the construction of an additional T3 power at 100%, 50% and 25% growth priorities, assuming unlimited mass fabrication capacity and engineering capacity.

Posted in Uncategorized | Tagged: , , , | Leave a Comment »

37. Aircraft Cost Charts

Posted by stevemata on July 5, 2009

Price is calculated in accordance with psalm 14
Price = Mass + E/40

Posted in Uncategorized | Tagged: , , , | Leave a Comment »